Focus on Reliability

Are Your PMs Preventing Failures? Three Checks Before You Run the Next Round

At a food plant I visited, the PM compliance trend looked great. It averaged 97% for months on end. In a meeting later, the supervisors told me they consistently beat the corporation's 95% target.

Out in the production areas, I found bearing fittings with two, sometimes three, different colors of grease clumped on the same zerk. Mind you, this was a food plant where food-grade grease is required. Due to overgreasing, the seals were blown, and grease was thick around the shafts.

The equipment kept failing. The PMs didn't address the likely failure modes. The team was checking boxes, not preventing failures. No one was asking, "Are we doing the right work, or just doing work to meet the metric?"

Your PMs are already in the CMMS. Most are set up on a calendar: weekly, monthly, quarterly, annually. Each time the trigger comes up, the same tasks come out again for your technicians to do. Unless someone changes the work or the frequency, the next round comes out right on schedule. Before it does, find out whether the work coming out of the system is worth doing.

It isn't a new bill each round. It's your own technicians' time, already on the schedule. The question is whether that time goes to work that identifies potential failure conditions and addresses them.